Fifteen Estates: Annual Operating Funds
4 November 2026 selling-rate comparisons | Inherited planning scenarios; land purchase excluded
| Estate | USD million / year | ARS million / year, BNA | ARS million / year, blue |
|---|---|---|---|
| 3. Forest-edge estate | 0.438 to 1.133 | 686.898 to 1,778.999 | 684.711 to 1,773.333 |
| 4. Formal courtyard estate | 0.657 to 1.665 | 1,031.089 to 2,614.474 | 1,027.806 to 2,606.148 |
| 5. Axial estate and growing grid | 0.420 to 1.057 | 658.780 to 1,660.103 | 656.682 to 1,654.816 |
| 6. Lakeside mixed-use estate | 0.870 to 2.213 | 1,366.104 to 3,474.881 | 1,361.753 to 3,463.814 |
| 7. Long lakeside service estate | 0.991 to 2.473 | 1,556.419 to 3,881.857 | 1,551.463 to 3,869.494 |
| 8. Terraced landscape estate | 0.647 to 1.632 | 1,015.884 to 2,561.534 | 1,012.648 to 2,553.376 |
| 9. Waterfront and garden compound | 0.803 to 2.022 | 1,260.844 to 3,174.273 | 1,256.828 to 3,164.164 |
| 10. Dock and pavilion estate | 0.636 to 1.581 | 998.630 to 2,482.342 | 995.450 to 2,474.437 |
| 11. Sunset estate | 1.091 to 2.656 | 1,713.388 to 4,169.543 | 1,707.931 to 4,156.264 |
| 12. Shared courtyard estate | 0.788 to 1.982 | 1,236.407 to 3,112.368 | 1,232.469 to 3,102.456 |
| 13. Runway-adjacent estate | 0.644 to 1.619 | 1,010.342 to 2,542.473 | 1,007.124 to 2,534.376 |
| 14. Pond-centred estate | 0.702 to 1.749 | 1,101.434 to 2,745.349 | 1,097.926 to 2,736.606 |
| 15. Agricultural service estate | 0.930 to 2.231 | 1,460.163 to 3,502.670 | 1,455.513 to 3,491.515 |
| 16. Mountain-waterfront estate | 0.814 to 1.989 | 1,278.098 to 3,122.997 | 1,274.028 to 3,113.051 |
| 17. Guest-house and water estate | 0.723 to 1.847 | 1,135.518 to 2,900.057 | 1,131.901 to 2,890.821 |
Gates, boundaries and arrival
Planning method | Diagram is not to scale and is not issued for construction
Arrival office
Vehicle route
Pedestrian route L R Viewing direction only A gate controls arrivals only if people can wait, turn, walk and leave without blocking emergency access. A wall is not evidence of a security rating.
Materials and information
Boundary survey; gate and operator schedule; posts and designed foundations; intercom; protected power and communications; lighting; signs; emergency release; drainage details.
Sequence and acceptance
1. Confirm the legal boundary and road access rights.
2. List pedestrian, car, delivery, livestock and emergency arrivals.
3. Plot the actual vehicle swept paths and waiting space.
4. Locate a pedestrian route outside the moving gate.
5. Choose gate travel, operator duty and manual release.
6. Design posts, foundations and wind resistance for the selected gate.
7. Coordinate buried services and drainage before excavation.
8. Install to the approved drawings and equipment instructions.
9. Test detection, stopping, communication and loss-of-power release.
10. Record settings, keys, service contacts and periodic test results.
Failure checks and limits
Reject a layout that traps waiting vehicles on the public road, obstructs responders or drains through the gate mechanism. Night review must include glare, pedestrian visibility and evacuation.
Family arrivals; visitor reception; service deliveries; livestock transport; emergency entry.
Units and terms in this account
USD United States dollar · ARS Argentine peso · BNA Banco de la Nación Argentina
