Fifteen Estates: Annual Operating Funds

4 November 2026 selling-rate comparisons | Inherited planning scenarios; land purchase excluded

EstateUSD million / yearARS million / year, BNAARS million / year, blue
3. Forest-edge estate0.438 to 1.133686.898 to 1,778.999684.711 to 1,773.333
4. Formal courtyard estate0.657 to 1.6651,031.089 to 2,614.4741,027.806 to 2,606.148
5. Axial estate and growing grid0.420 to 1.057658.780 to 1,660.103656.682 to 1,654.816
6. Lakeside mixed-use estate0.870 to 2.2131,366.104 to 3,474.8811,361.753 to 3,463.814
7. Long lakeside service estate0.991 to 2.4731,556.419 to 3,881.8571,551.463 to 3,869.494
8. Terraced landscape estate0.647 to 1.6321,015.884 to 2,561.5341,012.648 to 2,553.376
9. Waterfront and garden compound0.803 to 2.0221,260.844 to 3,174.2731,256.828 to 3,164.164
10. Dock and pavilion estate0.636 to 1.581998.630 to 2,482.342995.450 to 2,474.437
11. Sunset estate1.091 to 2.6561,713.388 to 4,169.5431,707.931 to 4,156.264
12. Shared courtyard estate0.788 to 1.9821,236.407 to 3,112.3681,232.469 to 3,102.456
13. Runway-adjacent estate0.644 to 1.6191,010.342 to 2,542.4731,007.124 to 2,534.376
14. Pond-centred estate0.702 to 1.7491,101.434 to 2,745.3491,097.926 to 2,736.606
15. Agricultural service estate0.930 to 2.2311,460.163 to 3,502.6701,455.513 to 3,491.515
16. Mountain-waterfront estate0.814 to 1.9891,278.098 to 3,122.9971,274.028 to 3,113.051
17. Guest-house and water estate0.723 to 1.8471,135.518 to 2,900.0571,131.901 to 2,890.821

Gates, boundaries and arrival

Planning method | Diagram is not to scale and is not issued for construction

Arrival office

Vehicle route

Pedestrian route L R Viewing direction only A gate controls arrivals only if people can wait, turn, walk and leave without blocking emergency access. A wall is not evidence of a security rating.

Materials and information

Boundary survey; gate and operator schedule; posts and designed foundations; intercom; protected power and communications; lighting; signs; emergency release; drainage details.

Sequence and acceptance

1. Confirm the legal boundary and road access rights.

2. List pedestrian, car, delivery, livestock and emergency arrivals.

3. Plot the actual vehicle swept paths and waiting space.

4. Locate a pedestrian route outside the moving gate.

5. Choose gate travel, operator duty and manual release.

6. Design posts, foundations and wind resistance for the selected gate.

7. Coordinate buried services and drainage before excavation.

8. Install to the approved drawings and equipment instructions.

9. Test detection, stopping, communication and loss-of-power release.

10. Record settings, keys, service contacts and periodic test results.

Failure checks and limits

Reject a layout that traps waiting vehicles on the public road, obstructs responders or drains through the gate mechanism. Night review must include glare, pedestrian visibility and evacuation.

Family arrivals; visitor reception; service deliveries; livestock transport; emergency entry.

Units and terms in this account

USD United States dollar · ARS Argentine peso · BNA Banco de la Nación Argentina