Planning method | Diagram is not to scale and is not issued for construction
Energy (kWh) and power (kW) are different requirements. A solar array and battery do not automatically provide outage operation or meet winter demand.
Materials and information
Failure checks and limits
The diagram is functional, not a wiring design. Cable sizes, protective devices and clearances require design. Spatial L/R colors never identify electrical conductors. Do not infer usable kWh from cabinet count.
Domestic loads; water pumping; workshop supply; essential circuits; measured outage planning.
PV array Inverter Distribution
Storage / controls Critical loads
Interval load data; critical-load list; solar resource model; modules and mounting; inverters; protection and isolation; metering; earthing design; battery system; cable and conduit schedules.
Sequence and acceptance
1. Record hourly loads and seasonal changes.
2. Separate critical loads from discretionary use.
3. Model available solar resource and shading.
4. Choose grid-connected or approved island operation.
5. Size power and usable storage for the chosen duty.
6. Design mounting, protection and electrical distribution.
7. Obtain required interconnection and installation approvals.
8. Install and test through qualified electrical contractors.
9. Test outage behavior, alarms and safe isolation.
10. Monitor production, faults and battery condition over time.
kWh : Kilowatt-hour A unit of energy. One kilowatt supplied for one hour equals one kilowatt-hour, or 1,000 watt-hours. kW : Kilowatt A unit of power equal to one thousand watts. It states the rate of energy use or delivery.
Water-quality monitoring: a probe is not a complete laboratory
Water source, storage and treatment
Separate irrigation Sample / meter Household supply
Quantity, quality and permission are separate tests. A tank or a well label proves none of them. Keep drinking-water systems distinct from irrigation and reuse systems.
Hydrogeological investigation; abstraction permission where required; pumping test; accredited laboratory results; designed pump and pipework; protected tanks; treatment selected from results; sample points; meters.
Units and terms in this account
kWh kilowatt-hour, energy
PV Photovoltaic · kWh kilowatt-hour, energy