Wastewater, refuse and compost

Planning method | Diagram is not to scale and is not issued for construction

Domestic sewage Treatment Approved disposal

Refuse / recycling collection Farm wastes: separate route

Waste systems need collection, treatment or removal, and lawful final disposal. Tanks alone are not a complete wastewater design.

Materials and information

Wastewater flow and soil assessment; approved treatment and disposal design; access lids; pipes; alarms where required; collection vehicle route; segregated bins; compost pad and leachate controls.

Sequence and acceptance

1. List domestic sewage, washwater and solid wastes separately.

2. Estimate occupancy and peak flows.

3. Investigate soil, groundwater and disposal permissions.

4. Reserve treatment, disposal and replacement areas.

5. Keep vehicle loads and buildings off the disposal field.

6. Design separate handling for oils, chemicals and farm wastes.

7. Install to approved drawings with inspection before backfill.

8. Test operation, alarms and service access.

9. Train users on what the system can accept.

10. Keep pumping, inspections, collections and faults in a log.

Failure checks and limits

EPA describes typical household inspections at least every three years and pumping commonly every three to five years; mechanized alternatives often need annual inspection. Actual estate intervals depend on the system. Do not plant edible beds over a drainfield.

Household sewage; refuse collection; recyclables; compost handling; service contracts.

Heat, fuel and standby equipment

Selected heat plant Building demand

Meter / controls

Heat source and return paths

Select heat and standby systems from measured loads and required service. An enclosure in a picture gives no fuel type, capacity, efficiency or emissions specification.

Heat-loss and critical-load calculations; selected plant; designed pipework and controls; ventilation and flue arrangements; fuel storage if used; isolation; leak detection; metering; access for replacement.

1. Define indoor conditions and critical operating loads.

2. Calculate building heat losses and hot-water demand.

3. Compare equipment options using local energy supply.

4. Check emissions, fuel storage and permitting requirements.

5. Locate plant away from incompatible uses.

6. Design flues, ventilation, protection and access.

7. Install using qualified trades and manufacturer instructions.

8. Commission controls and test intended operating modes.

9. Record energy use and service intervals.

10. Review performance before expanding capacity.

Do not put combustion equipment in unventilated rooms or improvise electrical transfer arrangements. A fuel-storage allowance excludes fuel consumption.

Space heat; hot water; process heat; essential-service continuity; metered plant operation.

Units and terms in this account

US United States

EPA Environmental Protection Agency, United States