Planning method | Diagram is not to scale and is not issued for construction

Read the illustration’s labels

Pool with controlled

access

Filter / pump

Treatment

Test water; separate chemical storage

In the drawing: Pool with controlled access; Filter / pump Treatment; Test water; separate chemical storage

A recreation zone needs supervision, water quality, accessible routes and maintainable equipment. Decorative water and swimming pools are different systems.

Materials and information

Use and occupancy brief; designed pool or court; barriers and gates; slip-resistant surfaces; circulation and filtration; controls and test kits; segregated chemical storage; drainage; emergency equipment.

Sequence and acceptance

1. Define who will use the facility and how it is supervised.

2. Check site, access and applicable local requirements.

3. Separate swimming, play, traffic and chemical storage.

4. Design structure, drainage and hydraulic circulation.

5. Select compatible treatment and control equipment.

6. Install and inspect concealed plumbing before covering.

7. Test barriers, circulation and electrical protection.

8. Establish testing, cleaning and closure procedures.

9. Train the responsible operator and keep records.

10. Budget resurfacing, pump replacement and seasonal shutdown.

Failure checks and limits

Follow product instructions and local pool requirements. Never mix incompatible chemicals. CDC distinguishes routine water testing from injury prevention; both matter. No universal chemical dose is prescribed by this chapter.

Family pool; shared recreation; tennis court; play area; ornamental fountain.

Ponds, docks and waterfront structures

Read the illustration’s labels

Planning method | Diagram is not to

scale

and is not issued for construction

In the drawing: Planning method | Diagram is not to scale and is not issued for construction

Surveyed seasonal water level

Designed overflow Ground investigation

Shorelines, ponds and dams are governed by water, soil and downstream consequences. The image does not establish lake ownership, a stable bank or a lawful dock position.

Boundary and water-level survey; hydrology; ground investigation; ecological and consent review; designed embankment or basin; spillway where required; erosion protection; marine-rated structural system; access and inspection plan.

1. Confirm ownership, access and water rights.

2. Measure water levels, inflows and flood pathways.

3. Investigate soil, banks and downstream exposure.

4. Choose whether to retain, restore or construct the feature.

5. Obtain specialist design and necessary consents.

6. Plan excavation, spoil placement and sediment control.

7. Construct and inspect to the approved sequence.

8. Commission outlets and access facilities.

9. Set water-quality and structural inspection routines.

10. Record storms, leakage, erosion and repairs.

Do not infer dam dimensions or dock foundations from artwork. NRCS Handbook 590 is a planning reference, not a site design. Seepage, settlement and eroded spillways need professional assessment.

Pond restoration; irrigation storage; dock access; waterside pavilion; shoreline maintenance.

Units and terms in this account

NRCS Natural Resources Conservation Service