Read the frame in three dimensions
Read the illustration’s labels
height on sheet
1
Roof assembly
2
Main angle frame
3
Base connection
10 angle pieces: 2 × 1400 + 2 × 550 + 4 × 350 + 2 × 990 mm
Net main-frame length = 7.280 m. Roof stock is a separate schedule.
The ZeusC sheets dated 8 October 2026 show a main frame beneath a separate inclined roof. Read the two schedules separately: they use different steel profiles. The original full sheets remain in the source archive; the schedule below makes their readable dimensions searchable.
Assembly Profile Finished pieces Net length
Main frame 60 × 60 × 5 mm angle 2 × 1400; 2 × 550; 4 × 350; 2 × 990 mm 7.280 m
Roof frame 40 × 40 × 2.6 mm square tube
490; 478; 478; 910; 270; 270; 990 mm 3.886 m
Understand the connections before buying
The assembly sheet lists 12 M10 × 10L flange screws, 12 M10 nuts, 20 M10 washers and 16 M10 × 85L wedge anchors. The 10L screw entry needs clarification against the real joint stack. The drawing does not supply a verified anchor design, weld schedule, appliance mass limit or wind rating. Keep this unresolved item on the purchase record.
1. Identify the equipment and its clearances Record model, mass, mounting centres, manufacturer airflow clearances and service access. Read the 1400 mm overall-height, 350 mm support-height, 500 mm side-base, 1000 mm roof-width and 300 mm clearance callouts as labels on this particular source. Resolve inconsistent or incomplete datums before making a full-size part.
The heat-pump stand: parts, cuts and assembly (continued)
2. Count stock separately from parts For the ten main-frame parts, two assumed 6 m lengths provide 12,000 mm. Ten assumed 3 mm cuts use 30 mm, leaving 4690 mm before trimming. One possible allocation is 1400 + 1400 + 990 + 990 + 350 + 350 = 5480 mm on the first bar; 550 + 550 + 350 + 350 = 1800 mm on the second. The remainders after six and four cuts are 502 and 4188 mm.
3. Read the roof schedule independently The seven roof pieces total 3886 mm. Seven assumed 3 mm cuts leave 2093 mm from a 6000 mm stock length before trimming. The source roof pitch is 13.5°. Confirm whether each mitred length is measured to the long or short point. A profile with a 1.6 or 2 mm wall is not the specified 2.6 mm profile.
4. Make a non-powered 1:10 reading model Use two A4 sheets of 1 mm card, one 180 × 140 mm base, four 15 × 15 mm foot pads, one 120 × 80 mm roof skin, a 90 × 35 × 60 mm carton, two caps, 1 m tape and about 10 mL PVA. Tools: ruler, pencil, scissors and a scoring edge. The model’s card joints cannot establish the real stand’s capacity.
Cut ten 12 mm-wide strips at 140, 140, 55, 55, 35, 35, 35, 35, 99 and 99 mm. Fold each into a 6 × 6 mm angle. Label before assembly. Cut seven 16 mm-wide roof strips at 49, 48, 48, 91, 27, 27 and 99 mm; fold at 4 mm intervals and close with tape. The two 48 mm lengths round the scaled 47.8 mm source dimensions.
Dry-fit the frame on the base, check the upright orientation, then secure the feet. Fit the carton and cosmetic fan caps. Assemble and fit the roof separately. Look from the front and side, identify every joint and record changes made to obtain a fit. A successful card assembly does not settle the missing structural details.
Argentina, United States and European Union: quote the same specification
Request the exact profile, grade, wall, stock length and finish. List cutting, welding, coating, roof skin, connections, transport, tax and installation separately. The two schedules contain about 44.73 kg of net steel under a sharp-corner approximation and a 7850 kg/m³ density assumption. This arithmetic is neither a weighed purchase nor a complete installed cost. No matched current ARS, USD or EUR quotation is claimed.
Purchase line Quantity basis Cost record
Angle stock 2 × 6 m, assumed stock length ARS / USD / EUR quote required
Roof tube stock 1 × 6 m, assumed stock length Exact 2.6 mm wall; quote required
Roof skin and connections Reconciled design required Unquoted
Fabrication, finish and installation
Hours and process required Unquoted
Units and terms in this account
mm millimetre, 0.001 metre · × multiplied by · m metre, a length unit · = equals
L litre, a volume unit · × multiplied by · mm millimetre, 0.001 metre · m metre, a length unit · = equals · ° degree, an angle unit · PVA Polyvinyl acetate, the polymer in the specified white card or wood adhesive · mL millilitre, 0.001 litre
ARS Argentine peso · USD United States dollar · EUR Euro · kg kilogram, a mass unit · m³ cubic metre, a volume unit · m metre, a length unit · × multiplied by · mm millimetre, 0.001 metre