Well and raw-water test Abstraction permit; metered pump
Treatment train Chosen from raw-water results
Potable storage Covered; sampling; level control
Roof collection Debris removal; suitable diversion
Non-potable storage Label outlets; prevent cross-connection
Irrigation Demand schedule; controlled outlets
Waste streams Approved treatment and disposal
Treatment reject and backwash route around storage. Roof overflow and drainage require their own route. Arrows show function, not construction position. Never connect an untreated supply directly into the potable network.
Historical context
D442 · John Snow
Water System: Keep The Streams Separate
Analytical drawing. Example quantities are labelled; geometry is not a site survey.
Potable
Source test Treatment Clean store Users
Service water
Roof / source Quality check Service store Irrigation
Wastewater
Fixtures Collection Approved treatment
Discharge
Separate functional routes. Actual connections and backflow protection need a local design.
Blue Gold: A Ten-Year Decision Model
Three different values Water can have household value because it sustains life, productive value because it supports crops or services, and financial value through a lawful business. A change in scarcity does not raise these values equally. A remote property with expensive treatment can remain unattractive even if water becomes more scarce elsewhere.
Read the illustration’s labels
+
US$4 per delivered m³
A
B
C
D
E
| Key | Small-print annotation |
|---|---|
| A | Operating: |
| B | Renewal: US$800/year |
| C | US$1,200/year |
| D | 500 m³ actually delivered per year |
| E | Illustrative ratio. Land, financing and new capital are excluded. No return is forecast. |
Build three scenarios Base case: present demand with routine renewals. Stress case: lower source yield, more treatment and higher pumping costs. Expansion case: additional residents or productive uses with approvals and capital expenditure. Choose assumptions openly. Do not present a particular shortage, selling price or land appreciation by 2036 as established fact.
Compare delivered cost Illustrative annual costs: US$1,200 operating expense plus US$800 renewal allowance divided by 500 m³ actually delivered gives US$4/m³. This excludes land, finance and new capital. Repeat with real quotations and actual volume. A cheap well with expensive treatment may cost more than a different property’s established supply.
What to buy for Prefer demonstrated usefulness under the stress case: a suitable site, maintainable supply, measured quality and lawful use. Retain money for repairs and testing. Do not allocate the entire budget to land because an advertisement says permanent water or because a regional aquifer map covers the locality.
In the drawing: Operating: US$1,200/year; Renewal: US$800/year +; 500 m³ actually delivered per year; US$4 per delivered m³; Illustrative ratio. Land, financing and new capital are excluded. No return is forecast.
Units and terms in this account
US United States · m³ cubic metre, a volume unit