Well and raw-water test Abstraction permit; metered pump

Treatment train Chosen from raw-water results

Potable storage Covered; sampling; level control

Roof collection Debris removal; suitable diversion

Non-potable storage Label outlets; prevent cross-connection

Irrigation Demand schedule; controlled outlets

Waste streams Approved treatment and disposal

Treatment reject and backwash route around storage. Roof overflow and drainage require their own route. Arrows show function, not construction position. Never connect an untreated supply directly into the potable network.

Historical context

D442 · John Snow

Water System: Keep The Streams Separate

Analytical drawing. Example quantities are labelled; geometry is not a site survey.

Potable

Source test Treatment Clean store Users

Service water

Roof / source Quality check Service store Irrigation

Wastewater

Fixtures Collection Approved treatment

Discharge

Separate functional routes. Actual connections and backflow protection need a local design.

Blue Gold: A Ten-Year Decision Model

Three different values Water can have household value because it sustains life, productive value because it supports crops or services, and financial value through a lawful business. A change in scarcity does not raise these values equally. A remote property with expensive treatment can remain unattractive even if water becomes more scarce elsewhere.

Read the illustration’s labels

+

US$4 per delivered m³

A

B

C

D

E

KeySmall-print annotation
AOperating:
BRenewal: US$800/year
CUS$1,200/year
D500 m³ actually delivered per year
EIllustrative ratio. Land, financing and new capital are excluded. No return is forecast.

Build three scenarios Base case: present demand with routine renewals. Stress case: lower source yield, more treatment and higher pumping costs. Expansion case: additional residents or productive uses with approvals and capital expenditure. Choose assumptions openly. Do not present a particular shortage, selling price or land appreciation by 2036 as established fact.

Compare delivered cost Illustrative annual costs: US$1,200 operating expense plus US$800 renewal allowance divided by 500 m³ actually delivered gives US$4/m³. This excludes land, finance and new capital. Repeat with real quotations and actual volume. A cheap well with expensive treatment may cost more than a different property’s established supply.

What to buy for Prefer demonstrated usefulness under the stress case: a suitable site, maintainable supply, measured quality and lawful use. Retain money for repairs and testing. Do not allocate the entire budget to land because an advertisement says permanent water or because a regional aquifer map covers the locality.

In the drawing: Operating: US$1,200/year; Renewal: US$800/year +; 500 m³ actually delivered per year; US$4 per delivered m³; Illustrative ratio. Land, financing and new capital are excluded. No return is forecast.

D454 · Qanat

m³ / m3: Cubic metre The volume of a cube with edges one metre long. It holds one thousand litres.

UNESCO, United Nations Educational, Scientific and Cultural Organization The intergovernmental body responsible for the heritage or cultural record cited here. USD, United States dollar

Landmass: what is actually usable

Title, terrain, water and access | An estate image does not establish a parcel area

Build the land evidence file

Begin with legal title and a cadastral plan. Confirm recorded easements, access rights, boundaries, encroachments, planning use and any restrictions on subdivision or agriculture. A lake or shoreline in a picture is not evidence that it belongs to the parcel.

Add a measured topographic survey, flood evidence, slope and ground investigation, vegetation and habitat records, utility availability and water-source studies. Keep each layer dated and record who produced it.

Use these layers to separate land that can be built on, land that can be farmed, land reserved for services and access, and land that should remain protected. Usable area is a design result, not the gross acreage in an advertisement.

Area arithmetic example

Assume a hypothetical 20 ha parcel. Allocate 5 ha to protected land, 3 ha to access and service corridors, 2 ha to building and court zones and 10 ha to cultivation or pasture. These non-overlapping categories total 20 ha. They do not describe any of the fifteen pictures.

Avoid adding overlapping exclusions twice. A flood-prone forest may occupy the same ground as an ecological buffer. Use mapped intersections, then calculate the remaining usable area.

Land price is separate: verified sale area x negotiated price per hectare, plus the actual transaction costs. Do not multiply a regional asking price by a guessed image area. Obtain title, water and access advice before assigning value to an apparent development opportunity.

Argentina groundwater remains site specific

Buenos Aires Province Water Code article 85 addresses permission and technical hydrogeological documentation for new groundwater exploitation [B11]. Other provinces have their own rules. No estate location, borehole depth, pumping yield, potable-water quality or abstraction permission has been established here.

Protect the household core Assign drinking water, sanitation, food storage and communications to a defined service core. List the pumps and controls each depends on. A full tank does not guarantee delivery after distribution power fails.

Read the illustration’s labels

Estate Services: Organise By Dependence

HOUSEHOLD CORE

Water + sanitation + food

SUPPORT

Power + fuel + operator

ACCESS

Repair + communications

OPTIONAL

Recreation shutdown plan

HISTORICAL CONTEXT

A

B

KeySmall-print annotation
AAnalytical drawing. Example quantities are labelled; geometry is not a site survey.
BRead each record in its role. A proposal, historical object and measured result are distinct.

Separate discretionary demand Give the snow hall and optional amenities separate metering and an orderly shutdown plan. Test that their shutdown leaves the household core functioning.

Trace the support chain Record resource, equipment, consumable, operator and repair route for each service. A backup generator without suitable fuel, switching and a trained operator is an incomplete backup.

Rehearse a compound failure Work through loss of external power during heavy rain. Check water delivery, drainage, cold storage, access and communications. Record the first broken dependency and correct it before adding optional equipment.

In the drawing: HISTORICAL CONTEXT; Estate Services: Organise By Dependence; Analytical drawing. Example quantities are labelled; geometry is not a site survey.; HOUSEHOLD CORE Water + sanitation + food; SUPPORT Power + fuel + operator; ACCESS Repair + communications; OPTIONAL Recreation shutdown plan; Read each record in its role. A proposal, historical object and measured result are distinct.

D462 · Cordoba

Units and terms in this account

US United States · m³ cubic metre, a volume unit

ha hectare, 10,000 square metres