Machine-made real snow Real snow is frozen water. An all-weather snow generator can produce it through refrigeration even when conventional outdoor snowmaking conditions are unsuitable. Production capacity does not mean the snow will remain frozen inside a warm enclosure. The building must be designed around the desired indoor conditions and operating schedule.
Read the illustration’s labels
HISTORICAL CONTEXT
Snow, Synthetic Ski Surfaces And Scenery
REAL SNOW
Frozen water: cooling and
melting
DRY SURFACE
Purpose-made sliding mat and
upkeep
DECORATION
Appearance only; no ski rating
A
B
| Key | Small-print annotation |
|---|---|
| A | Analytical drawing. Example quantities are labelled; geometry is not a site survey. |
| B | Choose the activity, surface and supplier specification before comparing equipment and buildings. |
Synthetic ski surface A dry slope uses a purpose-made sliding surface instead of a refrigerated snow layer. Manufacturer systems may include misting, surface preparation and specialised maintenance. Neveplast describes such systems for skiing and training. This option can remove the snow-freezing duty, but it still needs drainage, safe run-out, access and professional slope design.
Decorative fake snow Decorative flakes, foam or absorbent display materials are a separate category. Their visual resemblance to snow does not establish a skiing surface, safe inhalation exposure or suitable drainage disposal. Select a product for its documented intended use. Do not mix decorative materials into a slope designed for real snow or a proprietary mat.
Five possible uses A beginner ski area; a supervised tubing attraction; a training facility; a snow-play space; or a scenic display. These require different surfaces, geometry, staffing and protective arrangements. Write one principal use into the brief. A private display is not a substitute specification for a public ski resort.
In the drawing: HISTORICAL CONTEXT; Snow, Synthetic Ski Surfaces And Scenery; Analytical drawing. Example quantities are labelled; geometry is not a site survey.; REAL SNOW Frozen water: cooling and melting; DRY SURFACE Purpose-made sliding mat and upkeep; DECORATION Appearance only; no ski rating; Choose the activity, surface and supplier specification before comparing equipment and buildings.
BIG documents CopenHill as a waste-to-energy plant with public recreation and an artificial ski surface on its roof. The combined programme does not erase fuel, emissions, residues, staffing or maintenance obligations.
D473 · Copenhill
Geometry is an example The section uses 60 m horizontal run, 6 m rise and 18 m width. Its 10% gradient is an arithmetic case, not an approved slope. Run-out, lifts, circulation and evacuation occupy additional space.
Read the illustration’s labels
A
B
C
D
E
F
G
| Key | Small-print annotation |
|---|---|
| A | Snow Dome: Reserve Space For The Whole System |
| B | Gradient: 10%; angle: 5.71° |
| C | Slope length: 60.30 m Width: 18 m Area: 1,085.4 m² |
| D | 6 m |
| E | Run-out extra |
| F | 60 m horizontal |
| G | An assumed 0.25 m normal layer gives 271.3 m³ bulk snow, not 271.3 m³ of liquid water. |
Close the thermal boundary Coordinate roof, walls and ground assembly as an insulated envelope. Identify penetrations, openings and vapour control. Air and moisture entering with visitors are operating loads.
Provide service access Locate plant and heat rejection outside the cold occupied space, with drainage and equipment-replacement access. No refrigerant, structural span or exit count is selected by this sketch.
Draw failure routes Reconcile stopped equipment, evacuation and repair access with the same measured geometry used for structure and services. A dome silhouette cannot establish these routes.
In the drawing: Snow Dome: Reserve Space For The Whole System; Run-out extra; 60 m horizontal; 6 m; Gradient: 10%; angle: 5.71°; Slope length: 60.30 m Width: 18 m Area: 1,085.4 m²; An assumed 0.25 m normal layer gives 271.3 m³ bulk snow, not 271.3 m³ of liquid water.
Jacob Perkins patented a working vapour-compression design in 1834, after an earlier proposal by Oliver Evans. Refrigeration moves heat. A cold hall must therefore have a designed route for rejecting heat outside its cold envelope.
D440 · Refrigeration
m³: Cubic metre The volume of a cube with edges one metre long. It holds one thousand litres.
Example slope geometry Take a horizontal run of 60 m, width 18 m and rise 6 m. Gradient is 6/60 = 10%; angle is approximately 5.71 degrees. The sloping length is sqrt(60² + 6²) = 60.30 m. Sloping area is about 1,085.4 m². This geometry excludes run-out, lift, circulation and safety margins.
Example initial snow layer At an assumed 0.25 m layer measured normal to the slope, volume is approximately 271.3 m³. This is bulk snow, not 271.3 m³ of liquid water. Snow density and compaction matter. The layer thickness is an arithmetic assumption, not an approved operating depth for skiing or a structural load specification.
Manufacturer benchmark and conditions Latitude90 lists L30 output at 60-66 m³/24 h with water at 5°C and ambient air at 15°C, water at 21 L/min and 3 bar, and running power of 67 kW for its stated 100 m blowing condition. These are vendor figures, not a witnessed site test. At 60 m³/day the example layer requires about 4.52 production days before losses.
What that benchmark excludes 67 kW for 24 hours is 1,608 kWh; 21 L/min for 24 hours is 30,240 L. Those arithmetic figures concern the listed machine. Building refrigeration, humidity control, lifts, lighting and maintenance add loads. Obtain written performance conditions and a complete site utility schedule before comparing suppliers or budgeting.
Historical context
The Smithsonian preserves John Gorrie's compressed-air ice-machine patent model of 1851. It documents an idea and its history, not the output or operating conditions of a modern snowmaking unit.
Snow-Facility Quantities
Analytical drawing. Example quantities are labelled; geometry is not a site survey.
Run-out extra
60 m horizontal
6 m
Gradient: 10%; angle: 5.71°
Slope length: 60.30 m Width: 18 m Area: 1,085.4 m²
An assumed 0.25 m normal layer gives 271.3 m³ bulk snow, not 271.3 m³ of liquid water.
credit or publication details.
Stages 1 to 5 1. Define skiing, tubing, snow play or display and the intended attendance. 2. Survey the site and confirm allowed use and access. 3. Design the slope, run-out, circulation and evacuation. 4. Establish indoor conditions and the local weather design basis. 5. Calculate envelope, ground, air, visitor and equipment heat loads.
Read the illustration’s labels
Design The Snow Hall As A Complete Facility
Evaporator: absorbs
heat
Compressor: work
input
Condenser: rejects
Expansion device
Q rejected = Q absorbed + work
A
| Key | Small-print annotation |
|---|---|
| A | Cycle explanation only. Refrigerant, pressures, equipment and enclosure need a specific design. |
Engineering record Cold indoor facilities require coordinated refrigeration, moisture control and envelope design. Ice-rink engineering references illustrate these interacting heat loads, but are not a ready-made ski-dome specification. Include solar gain, opening frequency, condensate, floor drainage and ground conditions. Agree on the design assumptions before obtaining equipment quotations.
Stages 6 to 10 6. Select the refrigeration and snow systems against those loads. 7. Design power, protection, water and waste connections. 8. Design the structure, foundations and construction sequence. 9. Commission temperature, moisture, surface and emergency systems. 10. Train operators and log energy, water, repairs and daily conditions.
A resilient operating hierarchy Keep household water, food storage and essential communication on a separately planned service priority. A ski dome can be a major discretionary load. Define an orderly shutdown and safe visitor evacuation for loss of power. Heat recovery may be useful, but only where the temperature, timing and nearby demand make it practical.
In the drawing: Design The Snow Hall As A Complete Facility; Evaporator: absorbs heat; Compressor: work input; Condenser: rejects heat Expansion device; Q rejected = Q absorbed + work; Cycle explanation only. Refrigerant, pressures, equipment and enclosure need a specific design.
Units and terms in this account
BIG Bjarke Ingels Group, the architectural practice · m metre, a length unit · % percent, parts per hundred
% percent, parts per hundred · ° degree, an angle unit · m metre, a length unit · m² square metre, an area unit · m³ cubic metre, a volume unit · = equals
m³ cubic metre, a volume unit · h hour, 60 minutes · °C degree Celsius, a temperature unit · L litre, a volume unit · bar bar, 100,000 pascals · kW kilowatt, 1,000 watts · m metre, a length unit · kWh kilowatt-hour, energy · % percent, parts per hundred · ° degree, an angle unit · m² square metre, an area unit
= equals