Example slope geometry Take a horizontal run of 60 m, width 18 m and rise 6 m. Gradient is 6/60 = 10%; angle is approximately 5.71 degrees. The sloping length is sqrt(60² + 6²) = 60.30 m. Sloping area is about 1,085.4 m². This geometry excludes run-out, lift, circulation and safety margins.
Example initial snow layer At an assumed 0.25 m layer measured normal to the slope, volume is approximately 271.3 m³. This is bulk snow, not 271.3 m³ of liquid water. Snow density and compaction matter. The layer thickness is an arithmetic assumption, not an approved operating depth for skiing or a structural load specification.
Manufacturer benchmark and conditions Latitude90 lists L30 output at 60-66 m³/24 h with water at 5°C and ambient air at 15°C, water at 21 L/min and 3 bar, and running power of 67 kW for its stated 100 m blowing condition. These are vendor figures, not a witnessed site test. At 60 m³/day the example layer requires about 4.52 production days before losses.
What that benchmark excludes 67 kW for 24 hours is 1,608 kWh; 21 L/min for 24 hours is 30,240 L. Those arithmetic figures concern the listed machine. Building refrigeration, humidity control, lifts, lighting and maintenance add loads. Obtain written performance conditions and a complete site utility schedule before comparing suppliers or budgeting.
Historical context
The Smithsonian preserves John Gorrie's compressed-air ice-machine patent model of 1851. It documents an idea and its history, not the output or operating conditions of a modern snowmaking unit.
Snow-Facility Quantities
Analytical drawing. Example quantities are labelled; geometry is not a site survey.
Run-out extra
60 m horizontal
6 m
Gradient: 10%; angle: 5.71°
Slope length: 60.30 m Width: 18 m Area: 1,085.4 m²
An assumed 0.25 m normal layer gives 271.3 m³ bulk snow, not 271.3 m³ of liquid water.
credit or publication details.
Stages 1 to 5 1. Define skiing, tubing, snow play or display and the intended attendance. 2. Survey the site and confirm allowed use and access. 3. Design the slope, run-out, circulation and evacuation. 4. Establish indoor conditions and the local weather design basis. 5. Calculate envelope, ground, air, visitor and equipment heat loads.
Read the illustration’s labels
Design The Snow Hall As A Complete Facility
Evaporator: absorbs
heat
Compressor: work
input
Condenser: rejects
Expansion device
Q rejected = Q absorbed + work
A
| Key | Small-print annotation |
|---|---|
| A | Cycle explanation only. Refrigerant, pressures, equipment and enclosure need a specific design. |
Engineering record Cold indoor facilities require coordinated refrigeration, moisture control and envelope design. Ice-rink engineering references illustrate these interacting heat loads, but are not a ready-made ski-dome specification. Include solar gain, opening frequency, condensate, floor drainage and ground conditions. Agree on the design assumptions before obtaining equipment quotations.
Stages 6 to 10 6. Select the refrigeration and snow systems against those loads. 7. Design power, protection, water and waste connections. 8. Design the structure, foundations and construction sequence. 9. Commission temperature, moisture, surface and emergency systems. 10. Train operators and log energy, water, repairs and daily conditions.
A resilient operating hierarchy Keep household water, food storage and essential communication on a separately planned service priority. A ski dome can be a major discretionary load. Define an orderly shutdown and safe visitor evacuation for loss of power. Heat recovery may be useful, but only where the temperature, timing and nearby demand make it practical.
In the drawing: Design The Snow Hall As A Complete Facility; Evaporator: absorbs heat; Compressor: work input; Condenser: rejects heat Expansion device; Q rejected = Q absorbed + work; Cycle explanation only. Refrigerant, pressures, equipment and enclosure need a specific design.
D440 · Refrigeration
Three different products Frozen snow requires water and thermal management. A synthetic ski surface supports sliding without a snow layer and has its own operating requirements. Decorative snow is a visual effect and should not be presented as a ski surface.
Read the illustration’s labels
Snow Dome: Choose The Surface
REAL SNOW
Frozen water: cooling and
melting
DRY SURFACE
Purpose-made sliding mat and
upkeep
DECORATION
Appearance only; no ski rating
HISTORICAL CONTEXT
A
B
| Key | Small-print annotation |
|---|---|
| A | Analytical drawing. Example quantities are labelled; geometry is not a site survey. |
| B | Choose the activity, surface and supplier specification before comparing equipment and buildings. |
Choose the brief first Record the intended activity, slope, capacity, season, operating hours, location and budget. Separate beginners, spectators, service vehicles and plant rooms.
Dome form A dome is an envelope geometry, not proof of structural or thermal performance. Choose materials and spans from a site-specific structural and building-services design.
Supplier claims TechnoAlpin describes temperature-independent snow production, but that does not mean an occupied indoor ski building needs no cooling or moisture control. Confirm current model data and site conditions. [L6]
In the drawing: HISTORICAL CONTEXT; Snow Dome: Choose The Surface; Analytical drawing. Example quantities are labelled; geometry is not a site survey.; REAL SNOW Frozen water: cooling and melting; DRY SURFACE Purpose-made sliding mat and upkeep; DECORATION Appearance only; no ski rating; Choose the activity, surface and supplier specification before comparing equipment and buildings.
D473 · Copenhill
Envelope and slope Primary structure; foundations; insulated enclosure; vapour and air-control strategy; slope structure; wearing surface or snow layer; drainage; safe access and exits. Determine the structural and thermal design together.
Open the complete related drawing · page 542
Mechanical systems Refrigeration or cooling strategy; heat rejection; ventilation; dehumidification; water supply; snowmaking where selected; meltwater collection and treatment; controls and metering.
Operations and safety People movement or lift system; equipment hire; first aid; communications; lighting; maintenance access; staff facilities; cleaning and rescue procedures. Capacity and egress need professional design.
Conceptual sequence Brief and site study, option comparison, load calculations, approvals, detailed design, procurement, construction, commissioning and operational trial. Do not fabricate from this system diagram.
In the drawing: Snow Dome: Component Architecture; Evaporator: absorbs heat; Compressor: work input; Condenser: rejects heat Expansion device; Q rejected = Q absorbed + work; Cycle explanation only. Refrigerant, pressures, equipment and enclosure need a specific design.
Units and terms in this account
% percent, parts per hundred · ° degree, an angle unit · m metre, a length unit · m² square metre, an area unit · m³ cubic metre, a volume unit · = equals
m³ cubic metre, a volume unit · h hour, 60 minutes · °C degree Celsius, a temperature unit · L litre, a volume unit · bar bar, 100,000 pascals · kW kilowatt, 1,000 watts · m metre, a length unit · kWh kilowatt-hour, energy · % percent, parts per hundred · ° degree, an angle unit · m² square metre, an area unit
= equals
= equals · kW kilowatt, 1,000 watts
