Three different products Frozen snow requires water and thermal management. A synthetic ski surface supports sliding without a snow layer and has its own operating requirements. Decorative snow is a visual effect and should not be presented as a ski surface.

Read the illustration’s labels

Snow Dome: Choose The Surface

REAL SNOW

Frozen water: cooling and

melting

DRY SURFACE

Purpose-made sliding mat and

upkeep

DECORATION

Appearance only; no ski rating

HISTORICAL CONTEXT

A

B

KeySmall-print annotation
AAnalytical drawing. Example quantities are labelled; geometry is not a site survey.
BChoose the activity, surface and supplier specification before comparing equipment and buildings.

Choose the brief first Record the intended activity, slope, capacity, season, operating hours, location and budget. Separate beginners, spectators, service vehicles and plant rooms.

Dome form A dome is an envelope geometry, not proof of structural or thermal performance. Choose materials and spans from a site-specific structural and building-services design.

Supplier claims TechnoAlpin describes temperature-independent snow production, but that does not mean an occupied indoor ski building needs no cooling or moisture control. Confirm current model data and site conditions. [L6]

In the drawing: HISTORICAL CONTEXT; Snow Dome: Choose The Surface; Analytical drawing. Example quantities are labelled; geometry is not a site survey.; REAL SNOW Frozen water: cooling and melting; DRY SURFACE Purpose-made sliding mat and upkeep; DECORATION Appearance only; no ski rating; Choose the activity, surface and supplier specification before comparing equipment and buildings.

D473 · Copenhill

Envelope and slope Primary structure; foundations; insulated enclosure; vapour and air-control strategy; slope structure; wearing surface or snow layer; drainage; safe access and exits. Determine the structural and thermal design together.

Read the illustration’s labels

Design The Snow Hall As A Complete Facility

Evaporator: absorbs

heat

Compressor: work

input

Condenser: rejects

Expansion device

Q rejected = Q absorbed + work

A

Open the complete related drawing · page 542

KeySmall-print annotation
ACycle explanation only. Refrigerant, pressures, equipment and enclosure need a specific design.

Mechanical systems Refrigeration or cooling strategy; heat rejection; ventilation; dehumidification; water supply; snowmaking where selected; meltwater collection and treatment; controls and metering.

Operations and safety People movement or lift system; equipment hire; first aid; communications; lighting; maintenance access; staff facilities; cleaning and rescue procedures. Capacity and egress need professional design.

Conceptual sequence Brief and site study, option comparison, load calculations, approvals, detailed design, procurement, construction, commissioning and operational trial. Do not fabricate from this system diagram.

In the drawing: Snow Dome: Component Architecture; Evaporator: absorbs heat; Compressor: work input; Condenser: rejects heat Expansion device; Q rejected = Q absorbed + work; Cycle explanation only. Refrigerant, pressures, equipment and enclosure need a specific design.

D440 · Refrigeration

Use measured or quoted inputs Do not carry a single older 67 kW figure forward as a current universal snowmaker rating. Obtain the actual model datasheet and operating conditions. Add cooling, ventilation, lifts, lighting, pumping and other loads.

Snow dome: energy and water ledger

QuantityExample value
Example load60 kW
Run duration8 h
Energy used480 kWh
Ten such days4,800 kWh

Analytical drawing. Example quantities are labelled; geometry is not a site survey.

Illustrative electricity ledger. Keep water input, melt recovery and discharge in a separate balance.

Example arithmetic An assumed 60 kW load operating for eight hours consumes 480 kWh. Ten such operating days consume 4,800 kWh before other loads. This illustrates energy accounting only.

Water ledger Record water supplied to snowmaking, losses, meltwater recovery, treatment, cleaning and discharge. Volume of loose snow is not the same as liquid-water volume.

Design evidence Record peak demand, average duty, power availability, backup strategy, energy price, seasonal conditions and a metering plan. A snow dome cannot be called self-sustaining from a visual layout.

In the drawing: HISTORICAL CONTEXT; Snow Dome: Energy And Water Ledger; Analytical drawing. Example quantities are labelled; geometry is not a site survey.; Example load 60 kW; Run duration 8 h; Energy used 480 kWh; Ten such days 4,800 kWh; Illustrative electricity ledger. Keep water input, melt recovery and discharge in a separate balance.

D474 · Gorrie

kWh: Kilowatt-hour A unit of energy. One kilowatt supplied for one hour equals one kilowatt-hour, or 1,000 watt-hours.

Day programme Control arrival, equipment issue, supervised activity and spectator access. Keep maintenance routes separate. Record snow/surface condition, indoor environment and equipment checks.

Snow dome: day and night operating plan

ServiceOpenClosed
VisitorsSupervisedCleared
Surface inspectionRecordedRecorded
Plant and alarmsAssignedAssigned
Essential routesLitLit
Optional lightsProgrammeReduced

Both states use the same exits and geometry. Closing time does not end alarm responsibility.

Night programme Reduce optional lighting while preserving safe access and essential systems. Schedule maintenance only under suitable isolation and supervision. Record plant alarms and staffing responsibilities.

Matched-view requirement The day plan and night plan must share the same building geometry, entries, exits, plant rooms and routes. Record fixture locations, controlled areas and essential electrical loads on the same plan.

Drawing set Site plan; floor and slope plans; structural sections; envelope details; drainage and water flows; electrical single line; cable and equipment schedules; controls; emergency access. All require coordinated revision identifiers.

In the drawing: Snow Dome: Day And Night Operating Plan; SERVICE OPEN CLOSED; Visitors Supervised Cleared; Surface inspection Recorded Recorded; Plant and alarms Assigned Assigned; Essential routes Lit Lit; Optional lights Programme Reduced; Both states use the same exits and geometry. Closing time does not end alarm responsibility.

D460 · Greenwich

Units and terms in this account

= equals

= equals · kW kilowatt, 1,000 watts

kW kilowatt, 1,000 watts · h hour, 60 minutes · kWh kilowatt-hour, energy