Use measured or quoted inputs Do not carry a single older 67 kW figure forward as a current universal snowmaker rating. Obtain the actual model datasheet and operating conditions. Add cooling, ventilation, lifts, lighting, pumping and other loads.
Snow dome: energy and water ledger
| Quantity | Example value |
|---|---|
| Example load | 60 kW |
| Run duration | 8 h |
| Energy used | 480 kWh |
| Ten such days | 4,800 kWh |
Analytical drawing. Example quantities are labelled; geometry is not a site survey.
Illustrative electricity ledger. Keep water input, melt recovery and discharge in a separate balance.
Example arithmetic An assumed 60 kW load operating for eight hours consumes 480 kWh. Ten such operating days consume 4,800 kWh before other loads. This illustrates energy accounting only.
Water ledger Record water supplied to snowmaking, losses, meltwater recovery, treatment, cleaning and discharge. Volume of loose snow is not the same as liquid-water volume.
Design evidence Record peak demand, average duty, power availability, backup strategy, energy price, seasonal conditions and a metering plan. A snow dome cannot be called self-sustaining from a visual layout.
In the drawing: HISTORICAL CONTEXT; Snow Dome: Energy And Water Ledger; Analytical drawing. Example quantities are labelled; geometry is not a site survey.; Example load 60 kW; Run duration 8 h; Energy used 480 kWh; Ten such days 4,800 kWh; Illustrative electricity ledger. Keep water input, melt recovery and discharge in a separate balance.
D474 · Gorrie
kWh: Kilowatt-hour A unit of energy. One kilowatt supplied for one hour equals one kilowatt-hour, or 1,000 watt-hours.
Day programme Control arrival, equipment issue, supervised activity and spectator access. Keep maintenance routes separate. Record snow/surface condition, indoor environment and equipment checks.
Snow dome: day and night operating plan
| Service | Open | Closed |
|---|---|---|
| Visitors | Supervised | Cleared |
| Surface inspection | Recorded | Recorded |
| Plant and alarms | Assigned | Assigned |
| Essential routes | Lit | Lit |
| Optional lights | Programme | Reduced |
Both states use the same exits and geometry. Closing time does not end alarm responsibility.
Night programme Reduce optional lighting while preserving safe access and essential systems. Schedule maintenance only under suitable isolation and supervision. Record plant alarms and staffing responsibilities.
Matched-view requirement The day plan and night plan must share the same building geometry, entries, exits, plant rooms and routes. Record fixture locations, controlled areas and essential electrical loads on the same plan.
Drawing set Site plan; floor and slope plans; structural sections; envelope details; drainage and water flows; electrical single line; cable and equipment schedules; controls; emergency access. All require coordinated revision identifiers.
In the drawing: Snow Dome: Day And Night Operating Plan; SERVICE OPEN CLOSED; Visitors Supervised Cleared; Surface inspection Recorded Recorded; Plant and alarms Assigned Assigned; Essential routes Lit Lit; Optional lights Programme Reduced; Both states use the same exits and geometry. Closing time does not end alarm responsibility.
D460 · Greenwich
Snow dome: expand the brief before the plant
Choose the experience
A refrigerated ski slope, a small snow-play room and a snowfall installation have different buildings, visitor loads and plant. Choose the activity, occupancy, operating hours and acceptable snow condition before comparing suppliers.
Prepare a room and equipment schedule: entrance and airlocks; reception and changing; snow area; accessible circulation; rescue and first aid; maintenance access; refrigeration and heat rejection; electrical rooms; water treatment; meltwater drainage; storage and staff facilities.
Treat the envelope, vapor control and thermal bridges as part of the refrigeration problem. Doors, visitors, lighting, ventilation and grooming introduce heat and moisture. A snow-making machine rating is not the total cooling or electrical demand.
Numbered functional system
1. Insulated enclosure and vapor control
2. Airlocks and visitor circulation
3. Refrigeration and distribution
4. Heat rejection or a verified heat-use connection
5. Snow production and delivery
6. Water treatment and storage
7. Meltwater collection and discharge
8. Ventilation, humidity control and sensors
9. Electrical distribution and metering
10. Grooming, rescue and service access
TechnoAlpin describes mechanically refrigerated snow production [B14]. Select the exact equipment and obtain guaranteed performance at the chosen water, air and duty conditions. The earlier 67 kW example must not be used as a whole-dome specification.
Snow dome: energy, water and cost ledger
Worked sensitivity example | No supplier quotation or engineered cooling load is claimed
Build the load model
Cooling load includes envelope heat gain, infiltration, ventilation, people, lighting, equipment, snow-making and other process loads. Cooling capacity and electrical input are different. Use supplier performance at the actual operating conditions.
Illustrative electricity case: an assumed average input of 150 kW over 12 hours/day and 330 days/year gives 594,000 kWh/year. At an assumed $0.10-0.25/kWh, energy alone is $59,400-148,500/year. At 300 kW average input, both amounts double. Neither input is a recommended dome size.
Add demand charges, fixed charges, taxes, water, maintenance, staff, insurance and renewal. Purchased energy is not necessarily identical to the machine nameplate times opening hours because plant cycles and remains active outside visitor hours.
Water and procurement
Track makeup water, snow inventory, meltwater recovery, cleaning and discharge. State snow density and water temperature when converting between snow volume and water use. Do not assume a photographed snow depth or a fixed recovery percentage.
Request separate prices for the enclosure and civil work; refrigeration; heat rejection; snow production; water and drainage; controls and power; visitor facilities; commissioning; training; spare parts; service contract; and operating guarantees.
A complete dome capital estimate remains open. No site, size, climate, occupancy or equipment quotation is available. The utility example above is a sensitivity calculation, not a cost to construct the dome.
Failure checks
Check condensation, ice at exits, vapor leakage, insufficient heat rejection, loss of refrigeration, blocked meltwater drainage and failed alarms. Commission at defined occupancy and weather conditions, then compare measured energy and water against the guaranteed duty.
Units and terms in this account
= equals · kW kilowatt, 1,000 watts
kW kilowatt, 1,000 watts · h hour, 60 minutes · kWh kilowatt-hour, energy
kW kilowatt, 1,000 watts · kWh kilowatt-hour, energy