Keep a portable kit even when the preferred plan is to remain at home. Include documents, medicines, contacts, suitable clothing, water and the items needed by children, disabled household members and animals. Check routes in advance and avoid travelling into floodwater or other obvious hazards. Review the decision when conditions change. [R1]

Bug-in versus bug-out

Practical method and reference

Origin and practical purpose

The stay-or-leave decision has no universal threshold. Emergency planning separates hazards that can be managed indoors from hazards that make the location itself dangerous. Revisit the decision as conditions change; yesterday's safe choice may no longer apply.

Five applications

1. Flood warning: leave before routes close.

2. Fire: identify exits and a meeting point.

3. Outage: assess whether essential care can continue.

4. Heat emergency: identify access to a safer temperature.

5. Neighbour support: coordinate transport without delaying those at immediate risk.

Ten-step method

1. Name the hazard and its current source of information, with a time stamp.

2. Check for an evacuation instruction or immediate threat to life.

3. Check the building for obvious danger from a safe position; do not enter a damaged area to complete a checklist.

4. Ask whether anyone needs care or equipment that cannot function here.

5. Identify a reachable destination that can accept the people, pets and equipment involved.

6. Check routes using current information rather than a familiar route remembered from normal conditions.

7. Compare the risks of moving now with the risks of losing the opportunity to move later.

8. Choose the present action and write the evidence and the specific trigger that would change it.

9. Tell the household and designated contact the decision, destination if relevant and next check-in time.

10. Review at the stated time or immediately when warnings, access or care needs change.

Practical method and reference · continued

Worked example and measurements

A useful trigger is observable: water reaches the named road crossing, the care device reaches its specified backup limit, or the authority issues the stated warning. "Leave if things get bad" cannot be checked consistently. Record an alternative route and destination, but do not drive into floodwater to test whether either remains open.

Limits and failure checks

No numerical score can cancel an evacuation order or make a visibly unsafe building habitable. Emergency decisions require current local information.

800 Reference library

Vi · the complete bug‐in guide

Trace water from roof to tank

A visual reading of the existing method and its evidence.

Roof catchment Screened inlet Covered tank

Trace the roof runoff through gutter, inlet and storage, then locate the overflow and drawoff. A missing screen, blocked inlet or open cover changes how the system behaves.

Compare readings before and after rain. A tank that has overflowed or supplied water during the event cannot by itself measure total capture. Record these conditions with the levels.

Read the full method Earlier image gallery

Catchment yield and tank capacity

Identify the contributing roof

A tank receives water from the roof area draining to its connected downpipe, not automatically the whole building. Work from safe ground observations and plans. Mark ridges, valleys, gutters and other downpipes. Use the horizontal projected contributing area for rainfall-volume calculations. Confirm collection is suitable for the intended use. [M2]

Trace and measure the route

1. Follow roof to gutter, downpipe, screened inlet and closed tank. Locate the separate high-level overflow and the lower dispensing tap. [M2]

2. Read the actual tank rating, inlet sizes and installation instructions. Measure usable capacity and existing contents separately.

3. Check that the overflow discharges to a suitable place away from foundations. Plan for a full tank during continued rain, not just the first fill. [M2]

4. Keep roof runoff separate from drinking-water plumbing. This example supplies ornamental plants. Roof water can carry microbes and chemicals; a screen or first-flush diversion does not make it drinking water. [M12]

5. Record the roof area, rainfall depth, assumed collection loss and available tank space on one calculation sheet.

Worked example

A contributing area of 50 m² receiving 10 mm rain has a theoretical volume of 500 L: 1 mm over 1 m² equals 1 L. With an assumed collection factor of 0.80, the example yield is 400 L. This factor is a planning assumption to be replaced by observed performance. If a 200 L tank already contains 60 L, only 140 L of free space remains. It can retain at most another 140 L from that event; 260 L must pass elsewhere if the assumed 400 L reaches it.

Units and terms in this account

m² square metre, an area unit · mm millimetre, 0.001 metre · L litre, a volume unit · kg kilogram, a mass unit