A visual reading of the existing method and its evidence.
Roof catchment Screened inlet Covered tank
Trace the roof runoff through gutter, inlet and storage, then locate the overflow and drawoff. A missing screen, blocked inlet or open cover changes how the system behaves.
Compare readings before and after rain. A tank that has overflowed or supplied water during the event cannot by itself measure total capture. Record these conditions with the levels.
Read the full method Earlier image gallery
Catchment yield and tank capacity
Identify the contributing roof
A tank receives water from the roof area draining to its connected downpipe, not automatically the whole building. Work from safe ground observations and plans. Mark ridges, valleys, gutters and other downpipes. Use the horizontal projected contributing area for rainfall-volume calculations. Confirm collection is suitable for the intended use. [M2]
Trace and measure the route
1. Follow roof to gutter, downpipe, screened inlet and closed tank. Locate the separate high-level overflow and the lower dispensing tap. [M2]
2. Read the actual tank rating, inlet sizes and installation instructions. Measure usable capacity and existing contents separately.
3. Check that the overflow discharges to a suitable place away from foundations. Plan for a full tank during continued rain, not just the first fill. [M2]
4. Keep roof runoff separate from drinking-water plumbing. This example supplies ornamental plants. Roof water can carry microbes and chemicals; a screen or first-flush diversion does not make it drinking water. [M12]
5. Record the roof area, rainfall depth, assumed collection loss and available tank space on one calculation sheet.
Worked example
A contributing area of 50 m² receiving 10 mm rain has a theoretical volume of 500 L: 1 mm over 1 m² equals 1 L. With an assumed collection factor of 0.80, the example yield is 400 L. This factor is a planning assumption to be replaced by observed performance. If a 200 L tank already contains 60 L, only 140 L of free space remains. It can retain at most another 140 L from that event; 260 L must pass elsewhere if the assumed 400 L reaches it.
Check capacity after a real event
Record rain-gauge depth and tank level before and after rain. Note whether the tank overflowed, water was withdrawn or a diverter was active. If it overflowed, the change in stored volume cannot reveal total captured runoff. Repeat on a smaller event that does not fill the tank. Do not estimate a pipe bore or support rating from the picture. The example water mass at 200 L is approximately 200 kg, before the tank and fittings are added; see the inspection sequence on page 374.
Diagram notes
Follow the physical flow

A covered rainwater tank at CERES, Melbourne.
Pengo (catalogue attribution) CC BY-SA 3.0
Top inlet • high overflow • low tap
CERES: Centre for Education and Research in Environmental Strategies The Melbourne environmental education site pictured in the rainwater example.
Collection and rainwater systems
Practical method and reference
Origin and practical purpose
Roof-water collection is a longstanding practice in many climates. The particular system must match roof materials, rainfall, storage, maintenance and intended use. A collection diagram describes hydraulic connections; it does not establish drinking-water quality.
Five applications
1. Garden water: supply permitted non-potable uses.
2. Rainfall accounting: estimate possible collection.
3. Tank sizing: compare inflow with free capacity.
4. Maintenance training: follow water through each fitting.
5. Drought planning: separate stored runoff from drinking supplies.
Ten-step method
1. State the intended use before selecting a roof or tank; distinguish potable and non-potable plumbing.
2. Measure the horizontal catchment area in square metres, not the sloping roof surface guessed from a photograph.
3. Record rainfall depth in millimetres using a local measurement or a clearly identified design source.
4. Inspect roof and gutter materials and contamination risks from a safe location.
5. Specify screening, diversion and maintenance with a qualified local installer; no universal first-flush volume suits every roof.
6. Trace the falling path from gutter to inlet, keeping overflow below any level that could back water into the building.
7. Calculate theoretical volume and state any assumed collection efficiency separately.
8. Measure free tank capacity before the event, allowing for the existing stored volume.
9. Provide a screened overflow route to an appropriate discharge point; keep tank access secure.
10. After rain, compare collected volume with the estimate and inspect leaks, blockages and contamination before use.
Practical method and reference · continued
Rainfall, capture and available storage
Units and terms in this account
m² square metre, an area unit · mm millimetre, 0.001 metre · L litre, a volume unit · kg kilogram, a mass unit
CERES Centre for Education and Research in Environmental Strategies, Melbourne · BY-SA Creative Commons Attribution-ShareAlike
m² square metre, an area unit · mm millimetre, 0.001 metre · = equals · × multiplied by