Building records: site, roof and structural movement

Argentina: read a site before drawing a building

Read the illustration’s labels

A site record separates boundaries, access and drainage

House

Workshop

Store

Boundary

Vehicle access

Drainage route

Walking route

A surveyed plan needs a verified boundary, north direction, levels and dimensions.

This schematic explains records; it does not establish a site layout or building consent.

Keep delivery access, pedestrian movement and drainage as separate information.

Original explanatory schematic. The supplied project images retain their original marks; their sites are unconfirmed.

Begin with a surveyed boundary, north direction, levels, access, water, drainage and the legal building envelope. The eight supplied plans have unconfirmed sites and authors. Their layouts can support comparison of roads, plots, open space and circulation; their graphic appearance cannot establish what an Argentine site is allowed to build. Copy no boundary or dimension into a real project without a survey and a source.

A site record distinguishes access for people, service vehicles and surface water. Conflicts arise where routes require the same narrow space. A layout comparison can reveal a conflict; it does not predict flood depth, foundation settlement or legal compliance.

United States: a public room beneath a cantilever