Marina Bay Sands: structure and construction

Supplied reference; source date not established unless stated in the reading.

ZeusC supplied additions, sheet 055. Watermark preserved. Building design: Safdie Architects; executive architect: Aedas; engineering: Arup.

Building with living trees

A play pavilion looks simple in elevation. Its history begins with decisions that an elevation hides. Kew’s designers used a survey of the roots to choose where the supports could meet the ground. The treehouse concept supplied for this book raises a related question on a smaller site. The two chapters trace the survey first and the load path second.

A canopy building begins below ground

The Kew precedent The treehouse sheet shows a timber play pavilion built around the idea of an existing tree. Its central opening, raised platform, stair and sheltered space give a designer a real spatial problem to think about. The supplied sheet does not identify a surveyed site, architect or completion date for the pictured pavilion. Kew Gardens offers a separately documented case in which drawings, site decisions and an opening date can be checked.

In May 2008 the Treetop Walkway opened at Kew. The structure takes visitors about 18 metres above ground. Marks Barfield Architects describe radar surveys at proposed pylon locations so concrete piles could be positioned between major roots. A lattice-steel pile cap allowed water to reach the ground beneath. The design team also used the bridge balustrades as trusses. What looks like an edge for visitors could therefore contribute to the structural depth of the span.

A plan shows the approach, platform, trunk opening and inspection access that an elevation can hide. Kew supplies a documented design method; its foundations and dimensions belong to its own site.

Read the illustration’s labels

Living trees and independent supports need separate records

PLAN: ROOTS AND PROPOSED POSTS

Ochre: roots to be surveyed.

Green squares: proposed post positions.

SECTION: FOLLOW THE LOAD

Deck boards

Posts

Footings

Loads pass through framing and posts

to foundations and the supporting soil.

Allow for trunk growth, crown movement, water and inspection access.

Illustrative relationships only. Site survey and specialist design determine positions and sizes.

A section through the pavilion An opening around a trunk can make a platform look as if it rests on the tree. The load path has to be read in section. In the independent-post concept drawn here, a visitor’s weight acts on deck boards. The boards bear on framing, the framing on posts, and the posts on foundations. The soil supports the foundations while also supplying the living tree with water and air.

The same plan must account for several kinds of movement. A trunk grows in diameter. A crown responds to wind. Timber changes dimension as its moisture content changes. A rigid collar around living wood can turn a detail that looked generous on opening day into a point of contact later. Nor is all root damage visible at the surface. Construction access, accumulated fill and prolonged soil compaction can matter beyond the immediate outline of a post.

A record for an Argentine site

Record the crown, trunk, soil levels, observed roots and survey date. Add the proposed structure on a separate layer. Identify rainwater routes and inspection access. An arborist or engineer must establish the missing dimensions and structural details for the actual site.