Read the illustration’s labels
JAR SECTION
LOT RECORD
Hot-pack green beans
US pint: about 473 mL
25.4 mm headspace
GB-261105-01 / load A
Recipe + revision
Jar and closure identity
Site elevation
Venting + pressure times
Cooling + seal result
Release / hold decision
Section is schematic, not a pressure-vessel drawing. The 25.4 mm headspace belongs only to the worked green-bean process. A closure check cannot reconstruct missing process conditions. [D836, D837]
In the drawing: JAR SECTION LOT RECORD; 25.4 mm headspace; GB-261105-01 / load A; Recipe + revision; Jar and closure identity; Site elevation; Venting + pressure times; Cooling + seal result; Release / hold decision; Hot-pack green beans US pint: about 473 mL
RECORD AN INTERRUPTION AS IT HAPPENS Keep a clock beside the operator. Record the required pressure and the times at which venting, processing and natural cooling begin and end. When a deviation occurs, write what happened and the action actually taken. Do not fill in an uninterrupted trace after the event. The supervisor reviews the source process and the recorded load together before release; an illegible time or absent page requires investigation.
LEARN FROM THE FAILURE RATE Compare held units with all processed units and separately record the reasons. Two out of twelve is 16.7%, but closure faults, glass breakage and process deviations are different failure categories. Investigate the cause before purchasing another canner. The improvement may be a compatible closure, a clear work instruction or operator practice. A higher output target cannot compensate for batches whose history cannot be reconstructed.
ONE CODE CONNECTS THE WHOLE LOT Assign a code such as GB-261105-01 to the receiving record, preparation sheet and every finished jar. This invented code means green beans, 5 November 2026, first lot; it contains no safety claim. The sheet records supplier or harvest bed, ingredient masses, recipe revision, container, equipment serial number and operator. If two canner loads use the same prepared vegetables, give each load a suffix because their pressure histories may differ.
RECORD AN INTERRUPTION AS IT HAPPENS Keep a clock beside the operator. Record the required pressure and the times at which venting, processing and natural cooling begin and end. When a deviation occurs, write what happened and the action actually taken. Do not fill in an uninterrupted trace after the event. The supervisor reviews the source process and the recorded load together bfore release; an illegible time or absent page requires investigation.
Freezer capacity, capital and electricity
THREE RATINGS THAT MUST STAY SEPARATE Gafa’s FGHF200B-M manual lists 200 L net storage, 15.5 kg of fresh-food freezing capacity per 24 hours and 290 kWh annual energy consumption under its rating conditions. Litres describe space, kilograms per day describe a freezing load, and kWh describe energy. None is a substitute for the others. Its 220-240 V, 50 Hz supply specification also needs a compatible installation. Match the delivered model and manual revision before accepting the appliance. [D844] THE 60 KG-PER-DAY SCREENING CALCULATION For an assumed 60 kg of prepared product arriving daily, 60 ÷ 15.5 = 3.87 units, rounded up to four by nominal capacity. Four provide 62 kg per 24 hours; one out of service leaves only 46.5 kg. Five units would leave four operating after a single failure. This is arithmetic screening, not proof that five domestic freezers form a suitable processing plant. Measure actual loading, pack geometry, pull-down time and storage occupancy; compare a purpose-designed freezing installation before purchasing at scale.
A DATED ARGENTINE PRICE, WITH ITS LIMITS Leogar displayed ARS 578,999 for one FGHF200B-M in a single payment. The page also showed contradictory stock messages, so supply remains unconfirmed. Banco Nación’s 5 November 2026, 09:49 banknote selling rate was ARS 1,570 per USD. That makes one unit USD 368.79, four ARS 2,315,996 / USD 1,475.16, and five ARS 2,894,995 / USD 1,843.95. These are price comparisons, not installed quotations. Delivery, electrical work, monitoring, backup supply and financing are additional. [D845, D846] PAY FOR THE ENERGY THAT IS ACTUALLY USED Four rated units sum to 1,160 kWh/year and five to 1,450 kWh/year. Actual consumption depends on the room, use and loading. For a measured annual total E and electricity price T in ARS/kWh, energy cost is E × T; include fixed and demand charges separately. Do not size backup power from annual average watts. Have the electrical designer measure starting demand, operating load and required autonomy, then test the installation under a representative outage. RESERVE SPACE FOR TOMORROW’S HARVEST Storage can become full even when daily freezing capacity is adequate. At an invented 60 kg/day for six days, 360 kg enters the system before any withdrawals. Record how many actual packs fit under the approved loading arrangement and how much leaves each day. Set a maximum intake when occupancy or processing capacity is reached. Harvest scheduling, same-day use and another validated preservation route belong in the contingency plan.
kWh : Kilowatt-hour A unit of energy. One kilowatt supplied for one hour equals one kilowatt-hour, or 1,000 watt-hours. Hz : Hertz Frequency in cycles per second. ARS : Argentine peso The currency in which the local price, quote or exchange rate is recorded.
Units and terms in this account
US United States · mL millilitre, 0.001 litre · mm millimetre, 0.001 metre
% percent, parts per hundred · L litre, a volume unit · kg kilogram, a mass unit · kWh kilowatt-hour, energy · V volt, electrical potential difference · Hz hertz, cycles per second · = equals · ÷ divided by
ARS Argentine peso · USD United States dollar · kWh kilowatt-hour, energy · kg kilogram, a mass unit · × multiplied by · FDA Food and Drug Administration, the United States regulatory agency named in the dated source · US United States · FSAI Food Safety Authority of Ireland · °C degree Celsius, a temperature unit
