Build the record system and price its parts

A small bill of quantities | Assumed prices show the calculation; obtain local quotations before purchase

Mark the ground from fixed points After resolving access and drainage, set out the eight rectangles from a permanent baseline. Check bed width at both ends and compare diagonals. Use 32 corner stakes if each bed has four independent corners, plus eight durable numbered labels. Photograph the finished layout from a repeatable position and draw a map showing north, the baseline and water points. Keep a master and a working copy Prepare two copies of the map: one protected master and one field copy. Give each bed its own record with planting date, crop, family, source of seed or transplants, harvest, problems and actions. A waterproof label points to the record; it does not replace it. Save a dated copy after each seasonal revision.

An explicitly assumed purchase example At assumed prices of ARS 600 per stake, ARS 1,000 per label and ARS 500 per map copy, the calculation is 32 × 600 + 8 × 1,000 + 2 × 500 = ARS 28,200. A 10% allowance adds ARS 2,820, giving ARS 31,020. These are arithmetic inputs, not November 2026 supplier quotations. Convert only with a stated rate Using the earlier edition’s dated comparison rate of ARS 1,570 per USD on 5 November 2026, ARS 31,020 ÷ 1,570 = USD 19.76. Keep that date with the result and replace it when budgeting. The example excludes soil tests, tools, irrigation, compost, seed, paths, fencing and labour; it is a record-system purchase list, not the cost of the garden. Assign responsibility Name one steward for bed identities and one deputy who can recover the records. The person changing a planting enters it that day; the steward checks the family sequence before the next planting. Keep actual invoices and quantities beside the estimate so future budgets use observed costs. [D969; D959 at reference 1530]

Evidence and worked-example record Book II Continue

Audit a bed before the next planting

A repeatable handover | Record what happened, detect a broken interval and revise the plan

A five-minute weekly inspection For each bed, confirm its label, current crop, volunteer plants, irrigation condition and visible problem. Date the entry and attach a photograph when a change matters. Eight beds at five minutes each take 40 minutes per week. Over 52 weeks that is 2,080 minutes, or 34 hours 40 minutes. Add the seasonal review Four reviews at 1.5 hours each add six hours. Total record and review time in this assumed schedule is 40 hours 40 minutes per year. Sowing, watering, harvesting, travel, diagnosis and repairs are additional work. If the actual inspections take longer, use the observed time in the next staffing plan. Work a failed-history example Bed 1 held tomato in year one. The year-two main crop was pumpkin, but volunteer potatoes remained in the bed. The record now shows another Solanaceae host in year two. Mark the intended break as interrupted for any relevant host-dependent problem, identify the organism involved and obtain advice on the revised interval. Do not silently retain the original year-five promise.

Close the loop before handover The departing steward signs the current map and lists unresolved problems, excluded hosts, pending tests and missing records. The incoming steward walks the beds against that map. Store the dated file in two recoverable places and retain the preceding version. A useful archive lets another person explain a decision without needing the original gardener beside them. Acceptance check Every physical bed has one stable identifier. Every planting and cover crop has a family. Every proposed repeat has a traceable interval. Every diagnosed problem has an action and review date. Every budget states quantities, assumptions and exclusions. If a field is unknown, mark it unknown and resolve it before using the record as evidence. [D965-D969; D989]

Book II | Seasonal management and imported inputs

A planting date has two clocks

Units and terms in this account

m² square metre, an area unit · = equals · × multiplied by · ARS Argentine peso · USD United States dollar · % percent, parts per hundred · ÷ divided by