Read the four-year grid by column For bed A the sequence is nightshade, allium, legume and brassica; bed B follows brassica, nightshade, allium and legume. Shift each group one bed each year. The same family returns to the starting bed in year five if the sequence continues. A succession within a season also occupies that bed. Enter the actual host crop and dates even if it was an unplanned replacement after a failure.

Use an interruption where the evidence calls for one Different pests persist for different lengths of time and can use alternative hosts. A four-year drawing illustrates a sequence. Base a disease-specific interval on diagnosis and local advice. In a French case reported in 2019, Prosper Cochet described about twenty vegetables on one cropped hectare within a three-hectare rotation holding. The land held in reserve changes what rotations he can afford.

Buy for four beds and check after the first rain

A delivery for four beds

Measure Volume

As-placed target 720 L

Four 200 L units 800 L

Initial surplus 80 L

42 mm settled layer 604.8 L

Recheck the level marks

Settlement is a change in occupied volume. The example does not assign the change to a loss of mass.

Write a schedule the supplier can price Four beds need 720 L for the chosen 50 mm layer. Suppose four 200 L deliveries are the minimum purchasable units. At 800 L delivered, the arithmetic surplus is 80 L before losses or settling. At a teaching price of ARS 18,000 per 200 L unit, material costs ARS 72,000. Delivery at an assumed ARS 15,000 brings this order to ARS 87,000. The example includes neither framing nor labour.

Measure settling separately If the layer later averages 42 mm across the full 14.40 m², its geometric volume is about 604.8 L. Against a 720 L as-placed layer, the visible volume change is 115.2 L. That does not establish a comparable loss of soil mass or an automatic instruction to add further compost. Check the original level marks, any mixing at the interface, the crop requirement and soil condition first.

Look for the first operating fault After a downpour inspect drainage outlets. After a hot dry spell compare moisture at the head and tail of the bed and check water quality if salt accumulation is suspected. Record the bed ID and plant family when photographing a failed patch. In the next purchase compare the total delivered price, returned surplus, observed settling and hours of work against the original quantities.

Frost-free interval, observation height

Working with the year in both hemispheres

See the identified original illustration with its related account · page 815

INTA Las Breñas · 2026 Earlier subject source notes

Compare measurements made at the same height In Las Breñas, Chaco, INTA reports a 266-day average frost-free interval from measurements 5 cm above ground and 320 days from readings in a shelter at 1.5 m. The upper circle places the two heights alongside their intervals. A seedling close to the surface can face a different exposure from a thermometer in a standard shelter. Keep height, site and definition with each value.

Read the instrument field The lower photograph comes from the Las Breñas station’s published history. The station began recording temperature and rainfall in 1937. The field photograph documents instruments in their surroundings, while the dated account provides the history. The photographed equipment cannot by itself establish when any particular instrument was installed.

Plan for the crop where it will grow Write down the growing site, cultivar, sowing or transplant date, expected biological stage at harvest and reserve time. A grower in Esquel and one in the Chaco may work in the same hemisphere and still have very different planting opportunities. A northern calendar is useful for its measurement method once the local crop and weather record are supplied.

Las Breñas

Frost-free intervals

5 cm

1.5 m

266 d 320 d

54 days apart

INTA Chaco

Test a crop against an actual time window

From day zero to the deadline

Elapsed days Job or date

0 1 Dec 2026

16 Latest trial start

86 25 Feb 2027

100 11 Mar 2027

16 days of planning slack

Example uses 70 crop days and a 14-day reserve. Dates are chosen for arithmetic rather than local prediction.

State the date convention Use elapsed days, with the starting date at day zero. In a deliberately chosen example, day zero is 1 December 2026 and day 100 is 11 March 2027. A hypothetical 70-day crop and a 14-day reserve occupy 84 days and leave 16 days of slack. This trial window supplies arithmetic, not frost dates for a named Argentine site.

Check the biological starting point A 70-day description might begin at sowing, transplanting or another defined stage. Read the variety and supplier instructions. If the stated period begins at transplanting, nursery days belong on a separate line. Check site access, soil moisture, exposure and whether the crew can prepare the intended bed in time. The calendar can give a free day on which the soil is too wet to work.

Work out the last start and the consequence of delay In the example the latest planned start is day 16, 17 December. Seventy days later is 25 February and fourteen reserve days bring the plan to 11 March. A day-20 start leaves four days less than the chosen reserve requires. Options include a separately supported shorter cultivar, another site with a verified window or a smaller trial. Record which assumption changed.

Units and terms in this account

L litre, a volume unit · mm millimetre, 0.001 metre · ARS Argentine peso · m² square metre, an area unit

INTA Instituto Nacional de Tecnología Agropecuaria · cm centimetre, 0.01 metre · m metre, a length unit

INTA Instituto Nacional de Tecnología Agropecuaria · BY Attribution condition in a Creative Commons licence