Read the illustration’s labels

13

Ventilators

440 × 290 mm

24 + 24

Blotters + first spare change

430 × 285 mm

12

Newsprint folds

840 × 280 mm open

12 + 12

Tags + loose-part envelopes

One linked pair per packet

In the drawing: 13 Ventilators 440 × 290 mm; 24 + 24 Blotters + first spare change 430 × 285 mm; 12 Newsprint folds 840 × 280 mm open; 12 + 12 Tags + loose-part envelopes One linked pair per packet

Do not scale this page to cut boards. Use written dimensions; prepare 24 dry spare blotters. Modern teaching drawing · measurements apply only where stated.

The first change is an inspection

The Royal Horticultural Society recommends checking after 24 hours and replacing damp materials. Its guide gives a broad drying range of two days to three weeks, depending on the specimen and conditions. That range is not a completion promise. Open one packet at a time, compare its tag with the log and replace damp blotters without exchanging specimens. Record date, condition and action. Continue checks according to moisture and the receiving collection’s protocol. Suspect mould or pests require isolation and advice, not admission to the clean collection. [H11]

Allow time for the work that repeats

Plan 60 to 90 minutes to cut, smooth and assemble a first press if tools and precut paper are ready. Allow 60 to 120 minutes to arrange and log twelve simple packets and 20 to 40 minutes for one complete paper change. These are work-planning estimates to measure during your trial, not observed production rates. Drying elapsed time is separate from active labour. Twelve spaces in a press do not mean twelve finished specimens each day. A drying delay consumes capacity and may require a second press or fewer new collections.

Drying checks

Drying is a sequence of observations

Use the calendar to prompt a check, not to declare a specimen dry. Record field code, packet and observer before starting.

CheckWork and observation
PackingSpread diagnostic parts. Attach field code. Separate folds; keep air channels open.
After 24 hoursOpen and inspect every packet. Change damp blotters; restore labels and order.
Later checksRecord time, moisture, condition and action. Replace wet layers; shorten the interval if needed.
Before storageCheck material through its thickest parts. The receiving collection specifies treatment and storage.

RHS guidance gives a broad range: two days to three weeks. Plant thickness, humidity and air movement change the result. A damp specimen fails the check even when the timetable has ended.

Method sources: H09-H11, H22. No heater or chemical-treatment procedure is prescribed. Measurements apply only where stated.

Units and terms in this account

mm millimetre, 0.001 metre · m metre, a length unit · × multiplied by

mm millimetre, 0.001 metre · × multiplied by · RHS Royal Horticultural Society

TDWG Biodiversity Information Standards, historically the Taxonomic Databases Working Group · m metre, a length unit